Skip to main content

Update Strip Footing Drawing

Open BimSpeed.STR → Foundation → Update Strip Footing Drawing from a Section/Detail view or sheet. The current view determines host discovery and update scope.

Workflow​

  1. Save As before changing manually edited drawings. Open a horizontal-looking section; an invalid view direction is rejected.
  2. The longitudinal view must contain exactly one visible strip footing. Details also require a suitable host; check views containing multiple elements.
  3. On a sheet select supported viewports and Finish, distinguishing longitudinal and cross-section view families.
  4. Edit the enabled longitudinal or cross-section group. Shared inputs are documented in the Drawing guide.
  5. Run and compare view/viewport counts, tagged hosts, dimensions, elevations and manual edits. Preservation of all manual annotations has not been demonstrated.

Settings and actions​

Control / groupUnit / choicesEffect and verification
Active View / Selected ViewportsscopeUpdate is view-scoped, not all project footings.
Longitudinal Settings / Cross Settings / Other Settingsenabled groupsUpdate enables its applicable group; do not force disabled fields.
RunactionUpdates the drawing with current choices; model saving is separate.

Drawing control reference. A before/after runtime update is still missing; this guide describes source-confirmed scope and conditions.